Biogas Power Plant
Bioenergy Thessalias S.A.
Project | BGP Bioenergy Thessalias |
Fuel used | Biogas |
Location | Trikala |
Unit type | JMC 420 GS-BL v.B25 |
Total Power | 1.5 MW |
The biogas power plant of Bioenergy Thessalias S.A is under construction and is estimated that will be completed by the end of 2017. In the plant, there will be one GE Jenbacher JMC 420 GS-BL v.B25 CHP unit producing electric power of 1.5 MW. The cogeneration unit is fueled with biogas produced from anaerobic digestion process. The produced thermal energy will be used for the heating of the digesters, while the electric power will be sold to the Public Power Corporation.