

Project | BGP BIODELTA |
Fuel used | Biogas |
Location | Komotini |
Unit type | JMC 312 GS-B.LC v.D225 |
Total Power | 499 kW |
The biogas power plant of BIODELTA P.C. is under construction and is estimated that will be completed by the end of first half of 2018. In the plant, there will be one GE Jenbacher JMC 312 GS-B.LC v.D225 CHP unit producing electric power of 499 kW. The cogeneration unit is fueled with biogas produced from anaerobic digestion process. The produced thermal energy will be used for the heating of the digesters, while the electric power will be sold to the Public Power Corporation.